Tracked Type Cleaning Equipment Tumble Belt Shot Blasting Machine
Track-passing shot blasting machine come in many versions, types and sizes. They have a relatively small footprint. They are widely used because they are easy to integrate into a company's logistics. Machines are designed to offer high production cleaning of various parts and castings. They provide a cost effective solution for batch cleaning, deburring, descaling, decoring and peening a wide variety of products.
1. CE Wire Mesh Conveyor Shot Blast Machine is excellent for all-round, complete and continuous blasting treatment of flat as well as voluminous and very complex components.
2. With 4 or 8 high power blast wheels, mounted around the housing (both vertically and horizontally inclined), it is also possible to treat very complex components, which have "pockets" or difficult to reach areas.
3. A highly wear-resistant wire mesh belt, with tension adjustment, provides the part transport.
4. The special belt guiding enables the lower turbines to blast only through one belt position, which means that any masking is kept to a minimum.


| Type | Q698 | Q6912 | Q6915 | Q6920 | Q6925 | Q6930 | Q6940 |
| Effective cleaning width(mm) | 800 | 1200 | 1500 | 2000 | 2500 | 3000 | 4000 |
| Room feed-in size(mm) | 1000*400 | 1400*400 | 1700*400 | 2200*400 | 2700*800 | 3200*800 | 4200*400 |
| Workpiece length(mm) | 1200-12000 | 1200-1600 | 1200-12000 | 1200-12000 | 3000-12000 | 2400-12000 | 4500-18000 |
| Conveyer speed(m/min) | 0.5-4 | 0.5-4 | 0.5-4 | 0.5-4 | 0.5-4 | 0.5-4 | 0.5-4 |
| Steel thickness(mm) | 3-60 | 3-60 | 1.5-60 | 3-60 | 3-60 | 3-110 | 4.5-100 |
| Quantity of blasting(kg/min) | 4*180 | 4*250 | 4*250 | 6*250 | 6*250 | 6*360 | 8*360 |
| Total power (kw) | 90 | 78.3 | 113.5 | 156.6 | 204.8 | 224.55 | 293.6 |



Packaging Details: 40'HQ container
Leading Time: Around 30 days


A: Standard machines in stock can be delivered immediately. For customized designs, it typically takes 30 to 50 days from engineering design to production completion.
A: We prioritize quality control throughout the entire process. Each machine is fully assembled and undergoes rigorous testing before shipment.
A: We provide a one-year quality guarantee. We use world-famous brand components to ensure the machine remains in perfect working condition.
A: Yes, we provide overseas service. Small machines usually take 5 days for installation, while larger systems may take 20 days to two months.
A: We supply comprehensive English documentation, including foundation drawings, user manuals, electrical wiring diagrams, and maintenance guides.
A: We dispatch 1-2 technicians to assist directly with machine installation, commissioning, and staff training to ensure smooth operation.