High-Grade Aluminum Rain Gutter System

Customization: Available
Type: Decoration Aluminium Profile
Shape: Square

Product Description

Basic Information
Grade
6000 Series
Temper
T3-T8
Window & Door Profile
60 Series
Alloy
6063 / 6061 / 6005
Surface Finishing
Anodic Oxidation, Powder Coated
Product Name
Aluminum Rain Gutter
Certification
CE, SONCAP, ISO9001:2008
Quality
100% QC Testing
Production Capacity
30,000 Tons/Per Year
Fabrication
Cutting, Punching, Drilling, CNC
Product Description

Customized Architecture Extrusion Aluminium Coil Aluminum Rain Gutter

🛡️
Service Warranty: 20 years architectural warranty.
💧
Resistance: High corrosion & weather resistance (5-10 years).
📐
Customization: Size and OEM service fully supported.
Durability: Good wear resistance & anti-scratch surface.

We manufacture high-quality aluminum frames for Gutter systems. OEM and ODM requirements are welcome to meet your specific architectural needs.

Aluminum Gutter Installation Diagram
Technical Capabilities
Feature Details
Alloy 6063606160606005608264637075
Surface Finish Mill FinishAnodizingPowder CoatingWood GrainElectrophoresisPolishedBrushed
Standard DIN, AAMA, AS, CHINAGB, ISO9001: 2008
Machining Cutting, punching, drilling, bending, weld, mill, CNC, etc.
Frequently Asked Questions
What's the thickness for anodizing? Can you do 15um?
Our normal thickness is about 10um. Yes, we can provide 15um and above as per your requirements.
What colors and thicknesses are available for powder coating?
We can produce any color for powder coating based on your provided color samples. Our standard thickness ranges between 60-80um.
What types of wood grain finishes do you offer?
Popular options include Western Red Cedar, Australia Cedar, Jarrah, Chestnut, and Snow Gum. We can also customize colors based on your samples.
How is the weather resistance for the wood grain finish?
Using Akzo Noble Interpon D1010 powder and Italian Menphis film, our products comply with AAMA 2603 standards, passing 1000-hour UV and salt spray tests with a 10-year color guarantee.
What certifications and standards do your products follow?
We hold ISO certification. Our production follows international standards including DIN, AAMA, AS/NZS, and China GB.
What is the lead time for samples and mass production?
New mold creation and free samples take 2-3 weeks. Mass production generally requires 3-4 weeks after deposit and order confirmation.

Related Products